Stages of work
1. Inspection and preparation of the roof:
We inspected the old roof, recorded problem areas, including leaks and damaged battens. Old materials were dismantled with minimal risk to the structure.
2. Selection and preparation of materials:
Standing seam metal roofing was cut to the size of the roof and prepared for quick installation. We used special fasteners to avoid deformation due to temperature fluctuations.
3. Installation of the roof:
Installation of underlayment and insulation to protect against moisture.
Installation of metal panels according to the roof lines.
– Processing of joints, installation of end strips and finishing elements.
4. Quality control:
After installation, we checked the tightness of the seams, the evenness of the panels and the correctness of the fasteners.
At each step, we took into account the specifics of the object and potential risks to increase the accuracy and efficiency of the installation.