Shingles Roofing Installation in Pennsylvania
What should you do if the roof of an old house starts leaking or has several layers of worn-out roofing? This is exactly the problem that the owner of a residential building addressed us with. We were given the task of completely removing the old shingles, checking the substrate, and performing a high-quality installation of a new coating. More details about our approach to such work can be found on the Shingle Roofing page.
Stages of work
There were two layers of shingles on the house. We completely removed them to get to the base and assess its condition.
After dismantling, we checked the boards (OSB). It is important to make sure that they are not rotten and will withstand the new load. In this case, no replacement was needed.
On the cleaned base, we laid a rubber substrate and a special waterproof layer. It protects against moisture and condensation.
In the upper part, we installed a ridge vent, a ventilation element that allows the roof to “breathe” and reduces the risk of moisture inside.
We fixed all the elements, checked the joints, and tested the ventilation. The work was completed with a complete cleaning of the territory.
Features of the materials used
We used a certified waterproofing membrane and modern shingles with a manufacturer’s warranty. This coating is resistant to precipitation and temperature changes. Additionally, the owner received a warranty from the company for the work performed.
AFTER
Final Result
Thanks to strict adherence to the technology, the client received a completely renovated roof that will last for many years without additional problems.
The work was completed within the agreed time frame. The client left a review, noting the accuracy of the installation and the clear communication process.
The best roofing company. It took less than a day for the whole roof to be upgraded with new shingles. I am glad that GAF recommends them as authorized roofing company. Great job. Thank you.
Cost of Work and Terms
As part of the project, all the necessary work was completed by the client’s requirements. Taking into account the time, materials, and labor costs, the total cost was: