Stages of Work
The work on this facility consisted of several successive stages:
Dismantling of defective elements. We removed parts of the old structure that did not provide drainage. This made it possible to prepare the surface for the installation of a new frame.
Installation of the frame on a slope. We created the right slope for normal water drainage. The frame was assembled so that the water would be diverted away from the house and not stagnate on the surface.
Grinding and preparing the base. All elements were leveled and the surface was sanded for better adhesion to the waterproofing layers.
Application of rubber waterproofing. The balcony was sealed with a special waterproof material. It acts as a barrier that completely blocks the access of moisture to the frame.
Finishing and preparation for the pillars. After sealing, we installed the base for the future posts. Further finishing with decorative elements and siding was carried out by the following craftsmen.