Stages of Work
Dismantling the damaged flooring. We removed the old coating, which had lost its load-bearing capacity, and cleaned the substrate from the remains of rotten elements.
Restoration of the structure. We replaced the damaged sections of wood to give the balcony a solid foundation.
Creating a slope for water drainage. We created a small slope, thanks to which rainwater no longer accumulates, but flows outside.
Installation of a new layer of plywood. A new playwood was laid out, which became a flat base for further work.
Puttying and sanding. The joints were sealed with a special putty, and the surface was sanded to a perfectly smooth state.
Laying vinyl flooring. We applied a waterproof vinyl coating to the prepared base, which protects the balcony from further leaks.
Installation of fences. For the safety of using the balcony, we installed metal rails.